⎝⎛韦德足球⎞⎠

Lion King Video Network Alarm System Solution
  • Your current location : ⎝⎛韦德足球⎞⎠ > Network alarm system > 110 network alarm system >

  • 110 network alarm system installation and implementation steps

    Release time: 2015-08-26 14:35

    110 network alarm system installation and implementation steps


    [ Summary of content ] To install the 110 network alarm system, you must first install the alarm host, and the relevant infrared alarm device door sensor and other accessories. This step can not be less, the installation of an accessory may cause the entire system to fail. Reporting or underreporting results in wasting unnecessary police costs due to false positives.

    110 network alarm system installation

    Network alarm system installation steps

    To install the 110 network alarm system, we need to install the alarm device components in the system first, because this process will result in good or bad alarm sensitivity of the entire system. Therefore, the following installation steps are for the entire system installation. The most important part is the first installation work.

    I. Alarm host installation

    (1) Put the alarm host next to the telephone first, and then insert the telephone's external line plug and the telephone's incoming line plug into the two jacks on the upper side of the alarm host. There is no restriction on the order;

    (2) Turn on the battery switch on the back of the alarm host with a screwdriver or other sharp objects;

    (3) Plug the 9V power supply into the power socket on the upper side of the host computer. At this time, the LCD will display the time, and then the alarm host will generate a "b", which means the alarm host starts to work.

    Second, the door magnetic window magnetic alarm device installation

    Door magnetic window magnetic installation diagram


    (1) The door sensor has two parts: the launching block and the magnetic block. Then, choose one position of the door frame and the door leaf and fix the two parts with screws. When installing, you need to pay attention to the launching block. It will have An indicator light is facing the magnetic block side, and the left and right sides are aligned, but it should be noted that the distance between the two should not exceed fifteen millimeters; of course, the closer the distance, the better.

    (2) If the original double-sided adhesive is used during installation, the installation position must be smooth, free of dust, flat and free of unevenness. Why? If the installation location is not good and there are many dirts, you need to use alcohol or other water to clean it, and then wait for it to air dry before attaching it. Do not use double-sided adhesive to install in the wet position. It is easy to fall, but if the installation position is wooden, you need to fix it with screws to prevent it from falling off. When the undervoltage lamp of the main part of the magnetron lights up or the transmission distance is significantly reduced, the battery should be replaced. Battery type: 12V. 23A Standard High Energy

    Installation of infrared detector probe device

    Installation diagram of infrared detector


    (1) Open the upper cover of the infrared detector, connect the battery interface, wait for two minutes for self-test, and then start work;

    (2) The installation position should be about 16 millimeters from the wall, and the height is suitable to be 15 millimeters to 25 millimeters from the ground;

    (3) The position where the probe is fixed facing the monitoring area.

    Installation precautions: It must be installed indoors to avoid direct sunlight. Two infrared detectors cannot be installed in the unified detection area, and clothing, curtains, and tree branches should not be moved in the detection area.

    Wide-angle infrared detection angle: 55 degrees up and down, left and right: 110 degrees, distance is within 9 meters

    Curtain infrared detection angle: 90 degrees up and down, left and right: about 20CM thickness, distance is within 9 meters

    Installation of gas detector alarm device

    (1) Installation on the wall within 4 meters from the gas and gas source;

    (2) The installation height is within 0.5 meters from the ground according to different gas sources, and the artificial gas and natural gas are within 0.5 meters from the ceiling;

    (3) After connecting the 220V power supply, wait for 3 minutes for the warm-up process before entering the work. During the warm-up process, the red light will blink continuously.

    Installation precautions: The user needs to regularly check whether the alarm works normally, and clear the dirt and impurities on the surface of the casing in time to ensure the monitoring effect.

    Five, smoke detector alarm device installation

    (1) Put the original 9V battery into the battery box at the back, and then press the test button for more than three seconds, you can also blow smoke into the detector for testing. Means normal

    (2) The installation location should not be too close to the doorway or window, suitable for installation on the roof or the top of the wall.

    90% of users also read the following article

  • 110 network alarm system installation mode selection
    When the alarm operator installs the 110 network alarm system for the user, if there is no way to install it, four types can be adopted according to the actual environment of the user's installation ... [View Details]
  • 110 networked alarm system platform custom manufacturer
    Lion King network alarm manufacturers have been focusing on the security industry for more than ten years. They have rich technology and experience to solve the operation and use problems of various network alarm systems, [View Details]
  • 110 network alarm system installation and implementation steps
    To install the 110 network alarm system, you must first install the alarm host and related infrared alarm device door sensors and other accessories. This process can not be done in one step, less security ... [View Details]
  • 110 network alarm operation center solution
    Understanding 110 networked alarms is a necessary process for a newcomer to the networked alarm industry. A preliminary understanding of the development trend of the networked alarm industry is required, as well as the whole ... [View Details]
  • Ranch Ranch 110 network alarm system installation and implementation steps-Lion King network alarm
    韦德足球 欢乐拼三张 真人游戏平台注册 天天电玩城